1      Product
Description History

1.1    Document Location

This document is
only valid on the day it was printed.

The source of
the document will be found on the project’s PC in location

1.2    Revision
History

Date of this revision:        

Date of Next revision:      

 

Revision date

Previous revision date

Summary of Changes

Changes marked

 

 

First issue

 

 

1.3    Approvals

This document
requires the following approvals.

Signed approval
forms are filed in the Management section of the project files.

 

Name

Signature

Title

Date of Issue

Version

 

 

 

 

 

 

1.4    Distribution

This document
has been distributed to:

 

Name

Title

Date of Issue

Version

 

 

 

 

 

2      Table of Contents

                                                                                                                                            Page

 

1    Product Description
History                                                                                     1

1.1   Document Location                                                                                        1

1.2   Revision History

1.3   Approvals

1.4   Distribution

2    Table of Contents

3    Purpose

4    Composition

5    Derivation

6    Format and Presentation

7    Allocation

8    Quality Criteria

9    Quality Method

10  Quality Check Skills
Required

Post-Project Review Plan

3       Purpose

Company needs new building in same town
close to commercial centre with better work place so company can encourage
staff’s member to relocate while it is in same town.

4       Composition

Design
Safety
Location
Building
material

5       Derivation

Building
maintenance
Repairs
and alteration
Cost
effectiveness
Building
entrance
Furniture
Ceiling
height

6       Format and
Presentation

Building must be near
commercial centre.

Building comprised of 6 rooms,
2 meeting rooms, car parking and smoke area.

Budget for whole establishment
should not exceed more than £35000.

7       Allocation

Contractor and team assigned by contractor
are required to allocate the requirement

 

 

 

            Quality
Criteria

Quality Method

Quality Skills Required

1.   
Build
quality and robustness of systems, finishes and fittings, furniture and
equipment.

Quality review

Marketing team

2.   
Sustainability
of materials.

Material testing

Engineer

3.   
The
internal environment; lighting, heating, air quality, acoustics etc.

Inspection

Project management

4.   
Key
requirements of stakeholders.

Inspection

Project management

5.   
Building
view and outlook..

Inspection

Project management